Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Dread Guristas Control Tower Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
571,970,123.15
ISK
Sell Value
2,099,000,000.00
Profit
+1,527,029,876.85
ISK
Margin
72.8%
Build Time
13h 36m
1 run

Materials

8 items
Material Quantity Unit Price Total
3,150,000 11,781,000.00
525,000 9,597,000.00
157,500 9,078,300.00
52,500 12,619,950.00
26,251 19,309,973.09
42,000 60,609,360.00
15,750 46,279,327.50
1 390,200,000.00
Material Total 559,474,910.59
System Cost Index (0.14%) 422,543.42
SCC Surcharge (4%) 12,072,669.14
Job Installation Cost 12,495,212.56
Grand Total 571,970,123.15

Production Timeline

d
Assembly 13h 36m
1
Dread Guristas Control Tower
Dread Guristas Control Tower M
1 job, 1 run 13h 36m/job 13h 36m
Total Wall Clock Time 13h 36m

Required Skills