Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Dread Guristas Control Tower Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
373,154,252.84
ISK
Sell Value
1,940,000,000.00
Profit
+1,566,845,747.16
ISK
Margin
80.8%
Build Time
13h 36m
1 run

Materials

8 items
Material Quantity Unit Price Total
3,150,000 11,970,000.00
525,000 9,717,750.00
157,500 7,736,400.00
52,500 9,563,925.00
26,251 18,413,763.95
42,000 54,311,880.00
15,750 38,933,212.50
1 210,100,000.00
Material Total 360,746,931.45
System Cost Index (0.14%) 419,571.25
SCC Surcharge (4%) 11,987,750.13
Job Installation Cost 12,407,321.39
Grand Total 373,154,252.84

Production Timeline

d
Assembly 13h 36m
1
Dread Guristas Control Tower
Dread Guristas Control Tower M
1 job, 1 run 13h 36m/job 13h 36m
Total Wall Clock Time 13h 36m

Required Skills