Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Serpentis Control Tower Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
558,493,394.36
ISK
Sell Value
0.00
Profit
-558,493,394.36
ISK
Margin
0.0%
Build Time
13h 36m
1 run

Materials

8 items
Material Quantity Unit Price Total
3,000,000 11,220,000.00
500,001 9,140,018.28
150,001 8,643,057.62
50,001 12,018,740.37
25,001 18,596,243.82
40,000 57,705,600.00
15,000 43,962,000.00
1 383,100,000.00
Material Total 544,385,660.09
System Cost Index (0.14%) 477,073.14
SCC Surcharge (4%) 13,630,661.13
Job Installation Cost 14,107,734.27
Grand Total 558,493,394.36

Production Timeline

d
Assembly 13h 36m
1
Serpentis Control Tower
Serpentis Control Tower M
1 job, 1 run 13h 36m/job 13h 36m
Total Wall Clock Time 13h 36m

Required Skills