Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Sansha Control Tower Medium Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
281,037,147.47
ISK
Sell Value
1,362,000,000.00
Profit
+1,080,962,852.53
ISK
Margin
79.4%
Build Time
9h 4m 1s
1 run

Materials

8 items
Material Quantity Unit Price Total
1,500,001 5,610,003.74
250,001 4,570,018.28
75,000 4,323,000.00
25,001 6,009,740.38
12,501 9,195,610.59
20,000 28,861,600.00
7,501 22,040,713.37
1 189,800,000.00
Material Total 270,410,686.36
System Cost Index (0.14%) 359,348.93
SCC Surcharge (4%) 10,267,112.18
Job Installation Cost 10,626,461.11
Grand Total 281,037,147.47

Production Timeline

d
Assembly 9h 4m 1s
1
Sansha Control Tower Medium
Sansha Control Tower Medium M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills