Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Gallente Control Tower Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
359,807,335.21
ISK
Sell Value
453,800,000.00
Profit
+93,992,664.79
ISK
Margin
20.7%
Build Time
13h 36m
1 run

Materials

9 items
Material Quantity Unit Price Total
9 75,186,000.00
18 32,725,204.74
33 72,732,000.00
27 28,458,000.00
28 27,253,015.44
18 26,140,685.94
18 33,487,181.10
28 30,464,000.00
12 21,974,683.68
Material Total 348,420,770.90
System Cost Index (0.14%) 385,052.90
SCC Surcharge (4%) 11,001,511.42
Job Installation Cost 11,386,564.31
Grand Total 359,807,335.21

Production Timeline

d
Assembly 13h 36m
1
Gallente Control Tower
Gallente Control Tower M
1 job, 1 run 13h 36m/job 13h 36m
Total Wall Clock Time 13h 36m

Required Skills

Industry IIIII