Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Spatial Destabilization Battery Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
3,734,566.57
ISK
Sell Value
6,199,400.00
Profit
+2,464,833.43
ISK
Margin
39.8%
Build Time
1h 48m 49s
1 run

Materials

3 items
Material Quantity Unit Price Total
1 2,499.00
1 1,818,066.93
1 1,831,223.64
Material Total 3,651,789.57
System Cost Index (0.14%) 2,799.22
SCC Surcharge (4%) 79,977.78
Job Installation Cost 82,777.00
Grand Total 3,734,566.57

Production Timeline

d
Assembly 1h 48m 49s
1
Spatial Destabilization Battery
Spatial Destabilization Battery M
1 job, 1 run 1h 48m 49s/job 1h 48m 49s
Total Wall Clock Time 1h 48m 49s

Required Skills

Industry IIIII