Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

'Integrated' Warrior Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
282,208.80
ISK
Sell Value
267,248.91
Profit
-14,959.89
ISK
Margin
-5.6%
Build Time
2m 28s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 1,728.72
1 9,480.01
1 262,500.00
Warrior I
1 8,018.14
Material Total 281,726.87
System Cost Index (0.14%) 16.30
SCC Surcharge (4%) 465.64
Job Installation Cost 481.93
Grand Total 282,208.80

Production Timeline

d
Assembly 2m 28s
1
'Integrated' Warrior
'Integrated' Warrior M
1 job, 1 run 2m 28s/job 2m 28s
Total Wall Clock Time 2m 28s