Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

'Integrated' Warrior Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
235,658.21
ISK
Sell Value
273,286.06
Profit
+37,627.85
ISK
Margin
13.8%
Build Time
2m 28s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 1,000.00
1 4,503.00
1 222,156.86
Warrior I
1 7,521.15
Material Total 235,181.01
System Cost Index (0.14%) 16.14
SCC Surcharge (4%) 461.06
Job Installation Cost 477.20
Grand Total 235,658.21

Production Timeline

d
Assembly 2m 28s
1
'Integrated' Warrior
'Integrated' Warrior M
1 job, 1 run 2m 28s/job 2m 28s
Total Wall Clock Time 2m 28s