Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Golem Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
941,494,698.76
ISK
Sell Value
1,104,200,000.00
Profit
+162,705,301.24
ISK
Margin
14.7%
Build Time
1d 22h 38m
1 run

Materials

11 items
Material Quantity Unit Price Total
Raven
1 152,575,471.70
27 17,136.63
338 8,910,626.40
405 3,718,021.50
608 75,838,016.64
777 14,296,800.00
878 16,503,054.82
2,700 128,790,000.00
3,416 109,132,933.28
5,400 226,222,092.00
33,750 169,411,837.50
Material Total 905,415,990.47
System Cost Index (0.14%) 1,220,052.94
SCC Surcharge (4%) 34,858,655.35
Job Installation Cost 36,078,708.29
Grand Total 941,494,698.76

Production Timeline

d
Assembly 1d 22h 38m
1
Golem
Golem M
1 job, 1 run 1d 22h 38m/job 1d 22h 38m
Total Wall Clock Time 1d 22h 38m