Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

ORE Strip Miner Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
2,130,335.87
ISK
Sell Value
191,773,958.33
Profit
+189,643,622.46
ISK
Margin
98.9%
Build Time
19m 3s
1 run

Materials

5 items
Material Quantity Unit Price Total
159 393,040.05
88,793 337,413.40
27,552 509,987.52
7,026 345,117.12
670 469,971.50
Material Total 2,055,529.59
System Cost Index (0.14%) 2,529.68
SCC Surcharge (4%) 72,276.60
Job Installation Cost 74,806.28
Grand Total 2,130,335.87

Production Timeline

d
Assembly 19m 3s
1
ORE Strip Miner
ORE Strip Miner M
1 job, 1 run 19m 3s/job 19m 3s
Total Wall Clock Time 19m 3s

Required Skills