Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Anshar Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
5,356,464,938.21
ISK
Sell Value
7,714,000,000.00
Profit
+2,357,535,061.79
ISK
Margin
30.6%
Build Time
20d 10h 57m
1 run

Materials

12 items
Material Quantity Unit Price Total
Obelisk
1 1,544,909,090.91
27 492,480,000.00
54 32,230.44
570 172,767,000.00
599 246,804,412.60
607 311,421,671.71
700 357,726,593.00
951 842,395,800.00
951 586,149,915.12
1,368 438,687,818.64
2,025 19,224,459.00
3,375 72,596,148.75
Material Total 5,085,195,140.17
System Cost Index (0.14%) 9,173,374.81
SCC Surcharge (4%) 262,096,423.23
Job Installation Cost 271,269,798.04
Grand Total 5,356,464,938.21

Production Timeline

d
Assembly 20d 10h 57m
1
Anshar
Anshar M
1 job, 1 run 20d 10h 57m/job 20d 10h 57m
Total Wall Clock Time 20d 10h 57m