Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

650mm Artillery Cannon II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,187,828.57
ISK
Sell Value
1,835,139.91
Profit
+647,311.34
ISK
Margin
35.3%
Build Time
38m 18s
1 run

Materials

5 items
Material Quantity Unit Price Total
17 367,290.44
17 263,337.48
1 102,400.00
5 411,193.95
1 653.79
Material Total 1,144,875.66
System Cost Index (0.14%) 1,452.51
SCC Surcharge (4%) 41,500.40
Job Installation Cost 42,952.91
Grand Total 1,187,828.57

Production Timeline

d
Assembly 38m 18s
1
650mm Artillery Cannon II
650mm Artillery Cannon II M
1 job, 1 run 38m 18s/job 38m 18s
Total Wall Clock Time 38m 18s

Required Skills