Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Dual 650mm Repeating Cannon II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
2,470,694.37
ISK
Sell Value
4,940,706.74
Profit
+2,470,012.37
ISK
Margin
50.0%
Build Time
57m 27s
1 run

Materials

5 items
Material Quantity Unit Price Total
30 645,299.10
1 201,900.00
13 1,069,603.60
29 449,222.76
1 653.79
Material Total 2,366,679.25
System Cost Index (0.14%) 3,517.42
SCC Surcharge (4%) 100,497.70
Job Installation Cost 104,015.12
Grand Total 2,470,694.37

Production Timeline

d
Assembly 57m 27s
1
Dual 650mm Repeating Cannon II
Dual 650mm Repeating Cannon II M
1 job, 1 run 57m 27s/job 57m 27s
Total Wall Clock Time 57m 27s

Required Skills