Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Tengu Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
155,572,896.34
ISK
Sell Value
228,860,465.12
Profit
+73,287,568.78
ISK
Margin
32.0%
Build Time
1d 14h 52m
1 run

Materials

9 items
Material Quantity Unit Price Total
2 36,105,376.34
2 16,001,523.80
3 6,000,000.00
8 75,839,092.16
8 3,047,101.60
11 7,701,100.00
14 8,885.66
15 832,662.60
19 384,511.36
Material Total 145,920,253.52
System Cost Index (0.14%) 326,417.87
SCC Surcharge (4%) 9,326,224.95
Job Installation Cost 9,652,642.82
Grand Total 155,572,896.34

Production Timeline

d
Assembly 1d 14h 52m
1
Tengu
Tengu M
1 job, 1 run 1d 14h 52m/job 1d 14h 52m
Total Wall Clock Time 1d 14h 52m