Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Proteus Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
165,909,893.35
ISK
Sell Value
248,800,000.00
Profit
+82,890,106.65
ISK
Margin
33.3%
Build Time
1d 14h 52m
1 run

Materials

9 items
Material Quantity Unit Price Total
2 32,692,987.02
2 6,011,379.20
3 6,825,873.78
8 98,241,927.68
8 3,029,600.00
11 8,472,200.00
14 8,356.04
15 683,754.30
19 456,190.00
Material Total 156,422,268.02
System Cost Index (0.14%) 320,837.57
SCC Surcharge (4%) 9,166,787.76
Job Installation Cost 9,487,625.33
Grand Total 165,909,893.35

Production Timeline

d
Assembly 1d 14h 52m
1
Proteus
Proteus M
1 job, 1 run 1d 14h 52m/job 1d 14h 52m
Total Wall Clock Time 1d 14h 52m