Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Reconfigured Subspace Calibrator Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
363,328.90
ISK
Sell Value
504,629.56
Profit
+141,300.66
ISK
Margin
28.0%
Build Time
4m 55s
1 run

Materials

7 items
Material Quantity Unit Price Total
7 110,049.03
3 1,558.56
9 5,140.08
7 219,726.08
4 4,290.04
2 1,592.80
10 12,141.40
Material Total 354,497.99
System Cost Index (0.14%) 298.63
SCC Surcharge (4%) 8,532.28
Job Installation Cost 8,830.91
Grand Total 363,328.90

Production Timeline

d
Assembly 4m 55s
1
Reconfigured Subspace Calibrator
Reconfigured Subspace Calibrator M
1 job, 1 run 4m 55s/job 4m 55s
Total Wall Clock Time 4m 55s

Required Skills