Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Small Low Friction Nozzle Joints II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
2,731,861.32
ISK
Sell Value
3,207,678.87
Profit
+475,817.55
ISK
Margin
14.8%
Build Time
2h 2m 45s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 2,648,405.87
1 4,234.00
1 603.62
1 71,280.00
Material Total 2,724,523.49
System Cost Index (0.14%) 248.14
SCC Surcharge (4%) 7,089.69
Job Installation Cost 7,337.83
Grand Total 2,731,861.32

Production Timeline

d
Assembly 2h 2m 45s
1
Small Low Friction Nozzle Joints II
Small Low Friction Nozzle Joints II M
1 job, 1 run 2h 2m 45s/job 2h 2m 45s
Total Wall Clock Time 2h 2m 45s