Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Small Egress Port Maximizer I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
162,666.06
ISK
Sell Value
168,234.83
Profit
+5,568.77
ISK
Margin
3.3%
Build Time
13m 37s
1 run

Materials

3 items
Material Quantity Unit Price Total
3 9,795.78
2 143,960.00
3 8,257.26
Material Total 162,013.04
System Cost Index (0.14%) 22.08
SCC Surcharge (4%) 630.94
Job Installation Cost 653.02
Grand Total 162,666.06

Production Timeline

d
Assembly 13m 37s
1
Small Egress Port Maximizer I
Small Egress Port Maximizer I M
1 job, 1 run 13m 37s/job 13m 37s
Total Wall Clock Time 13m 37s

Required Skills