Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Heavy Ion Blaster II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,122,195.33
ISK
Sell Value
1,561,205.82
Profit
+439,010.49
ISK
Margin
28.1%
Build Time
38m 18s
1 run

Materials

5 items
Material Quantity Unit Price Total
16 344,140.16
16 288,332.48
5 411,456.45
1 30,853.10
1 653.79
Material Total 1,075,435.98
System Cost Index (0.14%) 1,581.23
SCC Surcharge (4%) 45,178.11
Job Installation Cost 46,759.35
Grand Total 1,122,195.33

Production Timeline

d
Assembly 38m 18s
1
Heavy Ion Blaster II
Heavy Ion Blaster II M
1 job, 1 run 38m 18s/job 38m 18s
Total Wall Clock Time 38m 18s

Required Skills