Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Heavy Neutron Blaster II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,307,075.77
ISK
Sell Value
1,956,516.21
Profit
+649,440.44
ISK
Margin
33.2%
Build Time
38m 18s
1 run

Materials

5 items
Material Quantity Unit Price Total
17 319,535.23
17 350,194.22
5 420,100.00
1 165,000.00
1 668.59
Material Total 1,255,498.04
System Cost Index (0.14%) 1,744.17
SCC Surcharge (4%) 49,833.55
Job Installation Cost 51,577.73
Grand Total 1,307,075.77

Production Timeline

d
Assembly 38m 18s
1
Heavy Neutron Blaster II
Heavy Neutron Blaster II M
1 job, 1 run 38m 18s/job 38m 18s
Total Wall Clock Time 38m 18s

Required Skills