Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Capital Hybrid Collision Accelerator II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
238,636,215.27
ISK
Sell Value
300,000,000.00
Profit
+61,363,784.73
ISK
Margin
20.5%
Build Time
8h 10m 58s
1 run

Materials

4 items
Material Quantity Unit Price Total
143 234,065,960.70
170 3,740,418.20
108 507,168.00
1 668.59
Material Total 238,314,215.49
System Cost Index (0.14%) 10,888.88
SCC Surcharge (4%) 311,110.90
Job Installation Cost 321,999.78
Grand Total 238,636,215.27

Production Timeline

d
Assembly 8h 10m 58s
1
Capital Hybrid Collision Accelerator II
Capital Hybrid Collision Accelerator II M
1 job, 1 run 8h 10m 58s/job 8h 10m 58s
Total Wall Clock Time 8h 10m 58s