Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Etana Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
94,455,491.36
ISK
Sell Value
0.00
Profit
-94,455,491.36
ISK
Margin
0.0%
Build Time
1h 48m 49s
1 run

Materials

15 items
Material Quantity Unit Price Total
501 18,092,422.62
14,589 54,562.86
6,185 113,061.80
16,111 928,638.04
100 2,914,906.00
2,718 1,999,333.62
447 645,056.76
26 76,397.62
61 1,317,924.52
51 1,046,010.00
175 3,540,250.00
51 484,238.88
1,501 9,085,553.00
1,200 48,610,908.00
16 1,590,720.96
Material Total 90,499,984.68
System Cost Index (0.14%) 133,761.10
SCC Surcharge (4%) 3,821,745.59
Job Installation Cost 3,955,506.68
Grand Total 94,455,491.36

Production Timeline

d
Assembly 1h 48m 49s
1
Etana
Etana M
1 job, 1 run 1h 48m 49s/job 1h 48m 49s
Total Wall Clock Time 1h 48m 49s

Required Skills