Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Scan Pinpointing Array II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
433,489.09
ISK
Sell Value
973,705.63
Profit
+540,216.54
ISK
Margin
55.5%
Build Time
38m 18s
1 run

Materials

6 items
Material Quantity Unit Price Total
8 76,169.04
9 98,275.05
6 90,006.30
3 121,527.27
1 35,548.69
1 411.50
Material Total 421,937.85
System Cost Index (0.14%) 390.62
SCC Surcharge (4%) 11,160.62
Job Installation Cost 11,551.24
Grand Total 433,489.09

Production Timeline

d
Assembly 38m 18s
1
Scan Pinpointing Array II
Scan Pinpointing Array II M
1 job, 1 run 38m 18s/job 38m 18s
Total Wall Clock Time 38m 18s