Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Scan Pinpointing Array II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
448,545.13
ISK
Sell Value
882,002.03
Profit
+433,456.90
ISK
Margin
49.1%
Build Time
38m 18s
1 run

Materials

6 items
Material Quantity Unit Price Total
8 74,872.00
9 88,056.00
6 77,777.40
3 125,678.94
1 70,023.35
1 494.32
Material Total 436,902.01
System Cost Index (0.14%) 393.73
SCC Surcharge (4%) 11,249.39
Job Installation Cost 11,643.12
Grand Total 448,545.13

Production Timeline

d
Assembly 38m 18s
1
Scan Pinpointing Array II
Scan Pinpointing Array II M
1 job, 1 run 38m 18s/job 38m 18s
Total Wall Clock Time 38m 18s