Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

High-grade Ascendancy Gamma Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
156,231,283.56
ISK
Sell Value
239,700,000.00
Profit
+83,468,716.44
ISK
Margin
34.8%
Build Time
1h 21m 36s
1 run

Materials

4 items
Material Quantity Unit Price Total
622 43,067,280.00
43 15,812,107.06
799 89,541,612.90
132 2,839,316.04
Material Total 151,260,316.00
System Cost Index (0.14%) 168,100.35
SCC Surcharge (4%) 4,802,867.20
Job Installation Cost 4,970,967.56
Grand Total 156,231,283.56

Production Timeline

d
Assembly 1h 21m 36s
1
High-grade Ascendancy Gamma
High-grade Ascendancy Gamma M
1 job, 1 run 1h 21m 36s/job 1h 21m 36s
Total Wall Clock Time 1h 21m 36s

Required Skills

Industry IIII