Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

High-grade Ascendancy Gamma Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
165,689,517.23
ISK
Sell Value
260,351,351.35
Profit
+94,661,834.12
ISK
Margin
36.4%
Build Time
1h 21m 36s
1 run

Materials

4 items
Material Quantity Unit Price Total
622 48,726,347.96
43 18,601,244.44
799 90,595,885.41
132 2,485,595.64
Material Total 160,409,073.45
System Cost Index (0.14%) 178,565.73
SCC Surcharge (4%) 5,101,878.05
Job Installation Cost 5,280,443.78
Grand Total 165,689,517.23

Production Timeline

d
Assembly 1h 21m 36s
1
High-grade Ascendancy Gamma
High-grade Ascendancy Gamma M
1 job, 1 run 1h 21m 36s/job 1h 21m 36s
Total Wall Clock Time 1h 21m 36s

Required Skills

Industry IIII