Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Gecko Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
14,620,065.30
ISK
Sell Value
227,473,563.22
Profit
+212,853,497.92
ISK
Margin
93.6%
Build Time
1h 38m 12s
1 run

Materials

20 items
Material Quantity Unit Price Total
1 538.26
2 4,348,758.64
3 53,112.66
5 90,103.90
5 97,850.00
6 9,431.28
9 42,300.00
9 26,377.20
9 2,070,446.13
9 4,376,700.00
13 58,539.00
15 15,000.00
17 1,326,915.28
17 1,398,712.40
17 365,669.49
33 47,607.12
50 37,191.00
95 22,835.15
5,778 105,621.84
10,935 40,896.90
Material Total 14,534,606.25
System Cost Index (0.14%) 2,889.92
SCC Surcharge (4%) 82,569.13
Job Installation Cost 85,459.05
Grand Total 14,620,065.30

Production Timeline

d
Assembly 1h 38m 12s
1
Gecko
Gecko M
1 job, 1 run 1h 38m 12s/job 1h 38m 12s
Total Wall Clock Time 1h 38m 12s