Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Gecko Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
15,863,622.86
ISK
Sell Value
214,395,131.09
Profit
+198,531,508.23
ISK
Margin
92.6%
Build Time
1h 38m 12s
1 run

Materials

20 items
Material Quantity Unit Price Total
1 669.24
2 4,761,760.56
3 90,000.00
5 102,215.20
5 93,700.00
6 16,039.14
9 80,207.64
9 22,247.55
9 2,363,527.98
9 4,808,339.01
13 123,118.71
15 25,893.60
17 1,327,597.83
17 1,404,170.59
17 320,114.59
33 42,673.62
50 35,072.50
95 17,306.15
5,778 106,950.78
10,935 41,553.00
Material Total 15,783,157.69
System Cost Index (0.14%) 2,721.04
SCC Surcharge (4%) 77,744.13
Job Installation Cost 80,465.17
Grand Total 15,863,622.86

Production Timeline

d
Assembly 1h 38m 12s
1
Gecko
Gecko M
1 job, 1 run 1h 38m 12s/job 1h 38m 12s
Total Wall Clock Time 1h 38m 12s