Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Polarized Light Neutron Blaster Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
879,830.52
ISK
Sell Value
3,941,308.27
Profit
+3,061,477.75
ISK
Margin
77.7%
Build Time
19m 9s
1 run

Materials

5 items
Material Quantity Unit Price Total
3 64,529.91
4 72,083.12
1 627,773.41
1 82,277.20
1 653.79
Material Total 847,317.43
System Cost Index (0.14%) 1,099.48
SCC Surcharge (4%) 31,413.61
Job Installation Cost 32,513.09
Grand Total 879,830.52

Production Timeline

d
Assembly 19m 9s
1
Polarized Light Neutron Blaster
Polarized Light Neutron Blaster M
1 job, 1 run 19m 9s/job 19m 9s
Total Wall Clock Time 19m 9s

Required Skills