Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Polarized Light Neutron Blaster Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
868,274.73
ISK
Sell Value
5,447,932.58
Profit
+4,579,657.85
ISK
Margin
84.1%
Build Time
19m 9s
1 run

Materials

5 items
Material Quantity Unit Price Total
3 56,388.57
4 82,398.64
1 613,018.02
1 84,020.00
1 668.59
Material Total 836,493.82
System Cost Index (0.14%) 1,074.72
SCC Surcharge (4%) 30,706.19
Job Installation Cost 31,780.91
Grand Total 868,274.73

Production Timeline

d
Assembly 19m 9s
1
Polarized Light Neutron Blaster
Polarized Light Neutron Blaster M
1 job, 1 run 19m 9s/job 19m 9s
Total Wall Clock Time 19m 9s

Required Skills