Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Polarized 200mm AutoCannon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
750,316.65
ISK
Sell Value
1,899,000.00
Profit
+1,148,683.35
ISK
Margin
60.5%
Build Time
19m 9s
1 run

Materials

5 items
Material Quantity Unit Price Total
1 528,618.80
2 37,660.54
4 75,660.44
1 82,598.27
1 668.57
Material Total 725,206.62
System Cost Index (0.14%) 849.13
SCC Surcharge (4%) 24,260.90
Job Installation Cost 25,110.03
Grand Total 750,316.65

Production Timeline

d
Assembly 19m 9s
1
Polarized 200mm AutoCannon
Polarized 200mm AutoCannon M
1 job, 1 run 19m 9s/job 19m 9s
Total Wall Clock Time 19m 9s

Required Skills