Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Polarized 425mm AutoCannon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,818,470.83
ISK
Sell Value
1,798,950.12
Profit
-19,520.71
ISK
Margin
-1.1%
Build Time
38m 18s
1 run

Materials

5 items
Material Quantity Unit Price Total
8 150,642.16
1 1,278,799.47
2 165,196.54
8 151,320.88
1 668.57
Material Total 1,746,627.62
System Cost Index (0.14%) 2,429.48
SCC Surcharge (4%) 69,413.73
Job Installation Cost 71,843.21
Grand Total 1,818,470.83

Production Timeline

d
Assembly 38m 18s
1
Polarized 425mm AutoCannon
Polarized 425mm AutoCannon M
1 job, 1 run 38m 18s/job 38m 18s
Total Wall Clock Time 38m 18s

Required Skills