Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Polarized 800mm Repeating Cannon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
4,721,506.03
ISK
Sell Value
4,397,325.15
Profit
-324,180.88
ISK
Margin
-7.4%
Build Time
57m 27s
1 run

Materials

5 items
Material Quantity Unit Price Total
16 344,159.52
1 3,791,000.00
2 164,554.40
15 232,356.60
1 653.79
Material Total 4,532,724.31
System Cost Index (0.14%) 6,383.92
SCC Surcharge (4%) 182,397.79
Job Installation Cost 188,781.72
Grand Total 4,721,506.03

Production Timeline

d
Assembly 57m 27s
1
Polarized 800mm Repeating Cannon
Polarized 800mm Repeating Cannon M
1 job, 1 run 57m 27s/job 57m 27s
Total Wall Clock Time 57m 27s

Required Skills