Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Polarized 800mm Repeating Cannon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
4,808,212.08
ISK
Sell Value
4,502,245.61
Profit
-305,966.47
ISK
Margin
-6.8%
Build Time
57m 27s
1 run

Materials

5 items
Material Quantity Unit Price Total
16 300,739.04
1 3,849,140.85
2 168,040.00
15 283,726.65
1 668.59
Material Total 4,602,315.13
System Cost Index (0.14%) 6,962.70
SCC Surcharge (4%) 198,934.25
Job Installation Cost 205,896.95
Grand Total 4,808,212.08

Production Timeline

d
Assembly 57m 27s
1
Polarized 800mm Repeating Cannon
Polarized 800mm Repeating Cannon M
1 job, 1 run 57m 27s/job 57m 27s
Total Wall Clock Time 57m 27s

Required Skills