Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Bowhead Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,186,155,879.98
ISK
Sell Value
1,498,230,769.23
Profit
+312,074,889.25
ISK
Margin
20.8%
Build Time
9d 10h 40m
1 run

Materials

9 items
Material Quantity Unit Price Total
14 202,160,000.00
5 72,738,022.80
5 65,380,459.75
27 409,320,000.00
5 35,720,000.00
7 131,147,724.54
360 16,453,166.40
180 14,610,630.60
1 191,074,074.07
Material Total 1,138,604,078.16
System Cost Index (0.14%) 1,608,031.95
SCC Surcharge (4%) 45,943,769.88
Job Installation Cost 47,551,801.82
Grand Total 1,186,155,879.98

Production Timeline

d
Assembly 9d 10h 40m
1
Bowhead
Bowhead M
1 job, 1 run 9d 10h 40m/job 9d 10h 40m
Total Wall Clock Time 9d 10h 40m

Required Skills