Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Entosis Link II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
137,370,504.56
ISK
Sell Value
170,413,333.33
Profit
+33,042,828.77
ISK
Margin
19.4%
Build Time
1h 16m 36s
1 run

Materials

14 items
Material Quantity Unit Price Total
1 28,630,000.00
63 9,213,183.63
72 2,192,843.52
63 8,322,816.60
63 7,858,215.54
63 8,076,600.00
144 4,404,428.64
90 4,293,000.00
72 3,168,709.20
2,700 50,749,713.00
18 1,409,630.04
18 1,591,245.72
36 2,879,154.36
1 494.32
Material Total 132,790,034.57
System Cost Index (0.14%) 154,895.12
SCC Surcharge (4%) 4,425,574.87
Job Installation Cost 4,580,469.99
Grand Total 137,370,504.56

Production Timeline

d
Assembly 1h 16m 36s
1
Entosis Link II
Entosis Link II M
1 job, 1 run 1h 16m 36s/job 1h 16m 36s
Total Wall Clock Time 1h 16m 36s