Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Entosis Link II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
140,280,663.84
ISK
Sell Value
192,400,000.00
Profit
+52,119,336.16
ISK
Margin
27.1%
Build Time
1h 16m 36s
1 run

Materials

14 items
Material Quantity Unit Price Total
1 30,621,408.45
63 6,974,230.41
72 2,976,338.16
63 6,086,799.81
63 6,263,463.78
63 7,377,546.96
144 4,728,903.84
90 3,250,135.80
72 2,994,762.24
2,700 58,334,364.00
18 1,246,320.00
18 1,516,860.00
36 3,195,725.40
1 411.50
Material Total 135,567,270.35
System Cost Index (0.14%) 159,390.12
SCC Surcharge (4%) 4,554,003.38
Job Installation Cost 4,713,393.49
Grand Total 140,280,663.84

Production Timeline

d
Assembly 1h 16m 36s
1
Entosis Link II
Entosis Link II M
1 job, 1 run 1h 16m 36s/job 1h 16m 36s
Total Wall Clock Time 1h 16m 36s