Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Deprecated Ore Prospecting Array 4 Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
154,283,984.37
ISK
Sell Value
367,200,000.00
Profit
+212,916,015.63
ISK
Margin
58.0%
Build Time
9h 4m 1s
1 run

Materials

9 items
Material Quantity Unit Price Total
4 33,424,000.00
8 17,648,564.16
8 14,667,188.72
9 16,379,356.95
9 13,077,185.85
9 16,763,120.19
12 12,669,840.96
12 11,680,416.96
12 13,080,000.00
Material Total 149,389,673.79
System Cost Index (0.14%) 165,508.09
SCC Surcharge (4%) 4,728,802.49
Job Installation Cost 4,894,310.58
Grand Total 154,283,984.37

Production Timeline

d
Assembly 9h 4m 1s
1
Deprecated Ore Prospecting Array 4
Deprecated Ore Prospecting Array 4 M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills