Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Deprecated Survey Networks 5 Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
290,003,794.10
ISK
Sell Value
596,000,000.00
Profit
+305,996,205.90
ISK
Margin
51.3%
Build Time
9h 4m 1s
1 run

Materials

9 items
Material Quantity Unit Price Total
8 66,848,000.00
12 26,472,846.24
12 22,008,530.64
17 30,914,299.23
17 24,701,351.05
17 31,672,882.07
25 26,394,919.00
25 24,339,121.25
25 27,250,000.00
Material Total 280,601,949.48
System Cost Index (0.14%) 317,936.77
SCC Surcharge (4%) 9,083,907.85
Job Installation Cost 9,401,844.62
Grand Total 290,003,794.10

Production Timeline

d
Assembly 9h 4m 1s
1
Deprecated Survey Networks 5
Deprecated Survey Networks 5 M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills