Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

CONCORD Quad 3500mm Siege Artillery Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
242,207,294.70
ISK
Sell Value
454,400,000.00
Profit
+212,192,705.30
ISK
Margin
46.7%
Build Time
5h 26m 24s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 180,000,000.00
6 11,852,725.02
10 12,250,000.00
20 25,737,850.80
Material Total 229,840,575.82
System Cost Index (0.14%) 418,198.22
SCC Surcharge (4%) 11,948,520.65
Job Installation Cost 12,366,718.88
Grand Total 242,207,294.70

Production Timeline

d
Assembly 5h 26m 24s
1
CONCORD Quad 3500mm Siege Artillery
CONCORD Quad 3500mm Siege Artillery M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills