Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Fortizar Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
7,206,024,856.71
ISK
Sell Value
10,342,307,692.31
Profit
+3,136,282,835.60
ISK
Margin
30.3%
Build Time
10d 4h 2m
1 run

Materials

12 items
Material Quantity Unit Price Total
4 324,152,653.08
4 224,000,000.00
4 227,920,000.00
4 136,080,000.00
9 356,469,230.79
9 378,270,000.00
9 451,710,000.00
9 298,260,000.00
9 300,060,000.00
9 442,980,000.00
9 360,270,000.00
36 3,278,980,000.08
Material Total 6,779,151,883.95
System Cost Index (0.14%) 14,435,317.92
SCC Surcharge (4%) 412,437,654.84
Job Installation Cost 426,872,972.76
Grand Total 7,206,024,856.71

Production Timeline

d
Assembly 10d 4h 2m
1
Fortizar
Fortizar M
1 job, 1 run 10d 4h 2m/job 10d 4h 2m
Total Wall Clock Time 10d 4h 2m

Required Skills