Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Fortizar Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
5,760,404,381.55
ISK
Sell Value
9,220,242,424.24
Profit
+3,459,838,042.69
ISK
Margin
37.5%
Build Time
10d 4h 2m
1 run

Materials

12 items
Material Quantity Unit Price Total
4 206,387,692.32
4 100,160,000.00
4 236,800,000.00
4 137,240,000.00
9 260,910,000.00
9 226,260,000.00
9 284,850,000.00
9 227,970,000.00
9 228,420,000.00
9 181,890,000.00
9 245,070,000.00
36 3,067,200,000.00
Material Total 5,403,157,692.32
System Cost Index (0.14%) 12,080,805.92
SCC Surcharge (4%) 345,165,883.32
Job Installation Cost 357,246,689.23
Grand Total 5,760,404,381.55

Production Timeline

d
Assembly 10d 4h 2m
1
Fortizar
Fortizar M
1 job, 1 run 10d 4h 2m/job 10d 4h 2m
Total Wall Clock Time 10d 4h 2m

Required Skills