Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Keepstar Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
143,714,818,595.30
ISK
Sell Value
0.00
Profit
-143,714,818,595.30
ISK
Margin
0.0%
Build Time
20d 22h 26m
1 run

Materials

17 items
Material Quantity Unit Price Total
8 240,000,000.00
8 440,000,000.00
8 664,240,000.00
72 5,834,747,755.44
72 4,032,000,000.00
72 4,102,560,000.00
72 2,449,440,000.00
180 7,129,384,615.80
180 7,565,400,000.00
180 9,034,200,000.00
180 5,965,200,000.00
180 6,001,200,000.00
180 8,859,600,000.00
180 7,205,400,000.00
225 883,876.50
720 65,577,600,000.00
900 3,959,586.00
Material Total 135,105,815,833.74
System Cost Index (0.14%) 291,125,697.25
SCC Surcharge (4%) 8,317,877,064.31
Job Installation Cost 8,609,002,761.56
Grand Total 143,714,818,595.30

Production Timeline

d
Assembly 20d 22h 26m
1
Keepstar
Keepstar M
1 job, 1 run 20d 22h 26m/job 20d 22h 26m
Total Wall Clock Time 20d 22h 26m

Required Skills