Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Keepstar Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
115,077,971,772.32
ISK
Sell Value
0.00
Profit
-115,077,971,772.32
ISK
Margin
0.0%
Build Time
20d 22h 26m
1 run

Materials

17 items
Material Quantity Unit Price Total
8 240,080,000.00
8 317,600,000.00
8 607,200,000.00
72 3,714,978,461.76
72 1,802,880,000.00
72 4,262,400,000.00
72 2,470,320,000.00
180 5,218,200,000.00
180 4,525,200,000.00
180 5,697,000,000.00
180 4,559,400,000.00
180 4,568,400,000.00
180 3,637,800,000.00
180 4,901,400,000.00
225 787,963.50
720 61,344,000,000.00
900 2,250,900.00
Material Total 107,869,897,325.26
System Cost Index (0.14%) 243,751,309.80
SCC Surcharge (4%) 6,964,323,137.26
Job Installation Cost 7,208,074,447.06
Grand Total 115,077,971,772.32

Production Timeline

d
Assembly 20d 22h 26m
1
Keepstar
Keepstar M
1 job, 1 run 20d 22h 26m/job 20d 22h 26m
Total Wall Clock Time 20d 22h 26m

Required Skills