Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Athanor Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
450,201,027.30
ISK
Sell Value
847,800,000.00
Profit
+397,598,972.70
ISK
Margin
46.9%
Build Time
3d 14h 8m
1 run

Materials

8 items
Material Quantity Unit Price Total
1 28,990,000.00
1 25,140,000.00
1 31,650,000.00
1 25,330,000.00
1 25,380,000.00
1 39,700,000.00
1 75,900,000.00
3 177,600,000.00
Material Total 429,690,000.00
System Cost Index (0.14%) 693,609.62
SCC Surcharge (4%) 19,817,417.68
Job Installation Cost 20,511,027.30
Grand Total 450,201,027.30

Production Timeline

d
Assembly 3d 14h 8m
1
Athanor
Athanor M
1 job, 1 run 3d 14h 8m/job 3d 14h 8m
Total Wall Clock Time 3d 14h 8m

Required Skills