Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup Reactor Control Unit I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
7,639,406.78
ISK
Sell Value
12,000,000.00
Profit
+4,360,593.22
ISK
Margin
36.3%
Build Time
5h 10m 5s
1 run

Materials

7 items
Material Quantity Unit Price Total
135 396,679.95
315 454,570.20
675 496,523.25
3,600 865,368.00
31,500 1,815,660.00
90,000 1,645,200.00
450,000 1,683,000.00
Material Total 7,357,001.40
System Cost Index (0.14%) 9,549.94
SCC Surcharge (4%) 272,855.44
Job Installation Cost 282,405.38
Grand Total 7,639,406.78

Production Timeline

d
Assembly 5h 10m 5s
1
Standup Reactor Control Unit I
Standup Reactor Control Unit I M
1 job, 1 run 5h 10m 5s/job 5h 10m 5s
Total Wall Clock Time 5h 10m 5s

Required Skills