Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup XL-Set Laboratory Optimization II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
84,489,863,655.27
ISK
Sell Value
0.00
Profit
-84,489,863,655.27
ISK
Margin
0.0%
Build Time
9h 4m 1s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 411.50
1,800 4,767,130,566.00
1,800 21,942,000.00
1,800 290,681,154.00
78,750 15,431,479,875.00
78,750 6,593,750,100.00
78,750 41,517,000,000.00
78,750 4,193,594,212.50
78,750 76,172,512.50
78,750 333,427,500.00
146,250 10,424,700,000.00
Material Total 83,649,878,331.50
System Cost Index (0.14%) 28,405,300.80
SCC Surcharge (4%) 811,580,022.96
Job Installation Cost 839,985,323.77
Grand Total 84,489,863,655.27

Production Timeline

d
Assembly 9h 4m 1s
1
Standup XL-Set Laboratory Optimization II
Standup XL-Set Laboratory Optimization II M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills

Industry IIIII