Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup M-Set Missile Projection II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
310,878,368.38
ISK
Sell Value
329,800,000.00
Profit
+18,921,631.62
ISK
Margin
5.7%
Build Time
4h 5m 29s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 653.79
4 2,244,736.40
4 289,160.00
4 4,346,850.80
90 94,584,294.00
90 30,750,786.00
90 6,415,200.00
90 1,417,635.00
675 132,269,827.50
675 35,945,093.25
675 652,907.25
Material Total 308,917,143.99
System Cost Index (0.14%) 66,321.60
SCC Surcharge (4%) 1,894,902.80
Job Installation Cost 1,961,224.39
Grand Total 310,878,368.38

Production Timeline

d
Assembly 4h 5m 29s
1
Standup M-Set Missile Projection II
Standup M-Set Missile Projection II M
1 job, 1 run 4h 5m 29s/job 4h 5m 29s
Total Wall Clock Time 4h 5m 29s

Required Skills