Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup M-Set Electronic Warfare Projection II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
316,489,480.85
ISK
Sell Value
399,700,000.00
Profit
+83,210,519.15
ISK
Margin
20.8%
Build Time
4h 5m 29s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 494.32
4 1,680,820.04
4 260,611.60
4 3,750,419.36
90 147,314,241.00
90 13,662,000.00
90 5,850,247.50
90 351,622.80
675 105,975,000.00
675 35,113,500.00
675 629,451.00
Material Total 314,588,407.62
System Cost Index (0.14%) 64,287.50
SCC Surcharge (4%) 1,836,785.73
Job Installation Cost 1,901,073.23
Grand Total 316,489,480.85

Production Timeline

d
Assembly 4h 5m 29s
1
Standup M-Set Electronic Warfare Projection II
Standup M-Set Electronic Warfare Projection II M
1 job, 1 run 4h 5m 29s/job 4h 5m 29s
Total Wall Clock Time 4h 5m 29s

Required Skills