Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup M-Set Electronic Warfare Economy II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
310,878,130.08
ISK
Sell Value
322,000,000.00
Profit
+11,121,869.92
ISK
Margin
3.5%
Build Time
4h 5m 29s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 411.50
4 2,244,736.40
4 289,160.00
4 4,346,850.80
90 94,584,294.00
90 30,750,786.00
90 6,415,200.00
90 1,417,635.00
675 132,269,827.50
675 35,945,093.25
675 652,907.25
Material Total 308,916,901.70
System Cost Index (0.14%) 66,321.73
SCC Surcharge (4%) 1,894,906.64
Job Installation Cost 1,961,228.38
Grand Total 310,878,130.08

Production Timeline

d
Assembly 4h 5m 29s
1
Standup M-Set Electronic Warfare Economy II
Standup M-Set Electronic Warfare Economy II M
1 job, 1 run 4h 5m 29s/job 4h 5m 29s
Total Wall Clock Time 4h 5m 29s

Required Skills