Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup L-Set Missile Flight Processor II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
4,714,262,046.84
ISK
Sell Value
0.00
Profit
-4,714,262,046.84
ISK
Margin
0.0%
Build Time
6h 8m 14s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 668.57
54 22,695,351.12
54 3,517,976.34
54 50,643,998.82
1,350 2,185,163,608.50
1,350 204,930,000.00
1,350 87,751,336.50
1,350 5,274,180.00
10,125 1,589,625,000.00
10,125 526,702,500.00
10,125 9,441,663.75
Material Total 4,685,746,283.60
System Cost Index (0.14%) 964,301.17
SCC Surcharge (4%) 27,551,462.06
Job Installation Cost 28,515,763.24
Grand Total 4,714,262,046.84

Production Timeline

d
Assembly 6h 8m 14s
1
Standup L-Set Missile Flight Processor II
Standup L-Set Missile Flight Processor II M
1 job, 1 run 6h 8m 14s/job 6h 8m 14s
Total Wall Clock Time 6h 8m 14s

Required Skills