Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup L-Set Energy Neutralizer Feedback Control II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
4,652,844,838.30
ISK
Sell Value
0.00
Profit
-4,652,844,838.30
ISK
Margin
0.0%
Build Time
6h 8m 14s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 518.01
54 30,303,941.40
54 3,903,660.00
54 58,682,485.80
1,350 1,418,764,410.00
1,350 461,261,790.00
1,350 96,228,000.00
1,350 21,264,525.00
10,125 1,984,047,412.50
10,125 539,176,398.75
10,125 9,793,608.75
Material Total 4,623,426,750.21
System Cost Index (0.14%) 994,814.57
SCC Surcharge (4%) 28,423,273.51
Job Installation Cost 29,418,088.09
Grand Total 4,652,844,838.30

Production Timeline

d
Assembly 6h 8m 14s
1
Standup L-Set Energy Neutralizer Feedback Control II
Standup L-Set Energy Neutralizer Feedback Control II M
1 job, 1 run 6h 8m 14s/job 6h 8m 14s
Total Wall Clock Time 6h 8m 14s

Required Skills