Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Kirin Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
15,588,034.70
ISK
Sell Value
14,171,962.17
Profit
-1,416,072.53
ISK
Margin
-10.0%
Build Time
15h 32m 50s
1 run

Materials

11 items
Material Quantity Unit Price Total
Bantam
1 130,155.06
4 498,934.32
6 3,808.14
14 263,146.66
14 447,266.12
23 211,146.90
23 606,344.40
54 993,600.00
113 4,733,906.74
113 5,390,100.00
338 1,696,628.18
Material Total 14,975,036.52
System Cost Index (0.14%) 20,729.41
SCC Surcharge (4%) 592,268.77
Job Installation Cost 612,998.18
Grand Total 15,588,034.70

Production Timeline

d
Assembly 15h 32m 50s
1
Kirin
Kirin M
1 job, 1 run 15h 32m 50s/job 15h 32m 50s
Total Wall Clock Time 15h 32m 50s