Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Kirin Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
14,343,801.26
ISK
Sell Value
15,888,963.73
Profit
+1,545,162.47
ISK
Margin
9.7%
Build Time
15h 32m 50s
1 run

Materials

11 items
Material Quantity Unit Price Total
Bantam
1 130,000.00
4 397,680.00
6 3,581.16
14 301,139.58
14 408,060.52
23 218,351.88
23 471,730.00
54 1,092,420.00
113 4,576,162.13
113 4,080,704.59
338 2,045,914.00
Material Total 13,725,743.86
System Cost Index (0.14%) 20,900.49
SCC Surcharge (4%) 597,156.91
Job Installation Cost 618,057.40
Grand Total 14,343,801.26

Production Timeline

d
Assembly 15h 32m 50s
1
Kirin
Kirin M
1 job, 1 run 15h 32m 50s/job 15h 32m 50s
Total Wall Clock Time 15h 32m 50s