Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Endurance Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
10,491,801.38
ISK
Sell Value
12,792,742.91
Profit
+2,300,941.53
ISK
Margin
18.0%
Build Time
15h 32m 50s
1 run

Materials

11 items
Material Quantity Unit Price Total
18 170,907.84
32 691,370.24
4 2,387.44
17 487,900.00
14 254,240.00
153 5,209,025.76
180 1,026,360.00
3 289,847.61
38 1,247,905.18
20 489,803.80
Venture
1 200,317.45
Material Total 10,070,065.32
System Cost Index (0.14%) 14,261.61
SCC Surcharge (4%) 407,474.45
Job Installation Cost 421,736.06
Grand Total 10,491,801.38

Production Timeline

d
Assembly 15h 32m 50s
1
Endurance
Endurance M
1 job, 1 run 15h 32m 50s/job 15h 32m 50s
Total Wall Clock Time 15h 32m 50s