Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Capital Knave Scoped Energy Nosferatu Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
35,534,434.38
ISK
Sell Value
140,000,000.00
Profit
+104,465,565.62
ISK
Margin
74.6%
Build Time
5h 26m 24s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 32,780,000.00
9 27,207.09
27 13,661.73
54 103,324.14
Material Total 32,924,192.96
System Cost Index (0.14%) 88,269.03
SCC Surcharge (4%) 2,521,972.39
Job Installation Cost 2,610,241.42
Grand Total 35,534,434.38

Production Timeline

d
Assembly 5h 26m 24s
1
Capital Knave Scoped Energy Nosferatu
Capital Knave Scoped Energy Nosferatu M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills