Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Triple Neutron Blaster Cannon I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
65,998,171.73
ISK
Sell Value
79,000,000.00
Profit
+13,001,828.27
ISK
Margin
16.5%
Build Time
5h 26m 24s
1 run

Materials

7 items
Material Quantity Unit Price Total
1,153 1,663,363.92
2,201 6,432,598.58
8,324 6,190,309.08
26,777 6,438,529.65
243,417 14,025,687.54
576,657 10,541,289.96
4,895,734 18,310,045.16
Material Total 63,601,823.89
System Cost Index (0.14%) 81,035.92
SCC Surcharge (4%) 2,315,311.93
Job Installation Cost 2,396,347.84
Grand Total 65,998,171.73

Production Timeline

d
Assembly 5h 26m 24s
1
Triple Neutron Blaster Cannon I
Triple Neutron Blaster Cannon I M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills