Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Triple Neutron Blaster Cannon II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
186,000,371.41
ISK
Sell Value
217,666,666.67
Profit
+31,666,295.26
ISK
Margin
14.5%
Build Time
4h 54m 35s
1 run

Materials

5 items
Material Quantity Unit Price Total
1 45,960,000.00
3 2,005.77
572 48,059,440.00
1,186 22,292,281.34
2,991 61,613,583.06
Material Total 177,927,310.17
System Cost Index (0.14%) 273,002.07
SCC Surcharge (4%) 7,800,059.17
Job Installation Cost 8,073,061.24
Grand Total 186,000,371.41

Production Timeline

d
Assembly 4h 54m 35s
1
Triple Neutron Blaster Cannon II
Triple Neutron Blaster Cannon II M
1 job, 1 run 4h 54m 35s/job 4h 54m 35s
Total Wall Clock Time 4h 54m 35s