Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Shadow Serpentis Ion Siege Blaster Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
216,413,608.04
ISK
Sell Value
0.00
Profit
-216,413,608.04
ISK
Margin
0.0%
Build Time
5h 26m 24s
1 run

Materials

13 items
Material Quantity Unit Price Total
1 196,300,000.00
24 966,446.64
24 1,392.24
26 7,553,309.66
26 738,958.48
26 2,080.52
26 4,472.26
29 2,321.16
29 87,667.29
31 59,315.71
32 16,184.64
33 60,885.00
33 46,662.00
Material Total 205,839,695.60
System Cost Index (0.14%) 357,571.92
SCC Surcharge (4%) 10,216,340.52
Job Installation Cost 10,573,912.44
Grand Total 216,413,608.04

Production Timeline

d
Assembly 5h 26m 24s
1
Shadow Serpentis Ion Siege Blaster
Shadow Serpentis Ion Siege Blaster M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills