Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Compressed Enduring Dual 1000mm Railgun Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
62,898,867.16
ISK
Sell Value
0.00
Profit
-62,898,867.16
ISK
Margin
0.0%
Build Time
5h 26m 24s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 59,325,263.16
23 1,334.23
29 41,006.00
36 66,420.00
Material Total 59,434,023.39
System Cost Index (0.14%) 117,168.63
SCC Surcharge (4%) 3,347,675.14
Job Installation Cost 3,464,843.77
Grand Total 62,898,867.16

Production Timeline

d
Assembly 5h 26m 24s
1
Compressed Enduring Dual 1000mm Railgun
Compressed Enduring Dual 1000mm Railgun M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills