Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Scout Scoped Dual 1000mm Railgun Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
62,382,492.79
ISK
Sell Value
94,980,000.00
Profit
+32,597,507.21
ISK
Margin
34.3%
Build Time
5h 26m 24s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 59,510,000.00
22 11,024.20
22 17,619.80
27 2.43
Material Total 59,538,646.43
System Cost Index (0.14%) 96,168.72
SCC Surcharge (4%) 2,747,677.64
Job Installation Cost 2,843,846.36
Grand Total 62,382,492.79

Production Timeline

d
Assembly 5h 26m 24s
1
Scout Scoped Dual 1000mm Railgun
Scout Scoped Dual 1000mm Railgun M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills